KM 1415–1430 | Year 2023–2024
At regalconstruction.engineering, we are proud to deliver reliable, high-quality maintenance services that ensure the safety and longevity of Pakistan’s major infrastructure. Our ongoing commitment to the Year-Long Routine Maintenance of GT Road N-5 (KM 1415–1430) reflects our dedication to excellence and national development.
Scope of Work:
✅ Vegetation Control
Routine cleaning and cutting of overgrown vegetation from shoulder to fence and along the center median using advanced and efficient methods to ensure unobstructed visibility and safety.
✅ Triple Surface Treatment
Application of triple surface treatment along road shoulders to strengthen surfaces, improve durability, and extend the life span of the road against weather and heavy usage.
✅ Pothole Repair
Timely filling and leveling of potholes to maintain smooth traffic flow and prevent structural damage.
✅ Drainage Maintenance
Cleaning of roadside drains to ensure efficient water flow, reduce erosion risks, and prevent waterlogging — securing both road structure and public safety.
Commitment to Excellence:
At regalconstruction.engineering, we understand that road maintenance is the backbone of safe transport and economic connectivity. Our dedicated team follows industry-leading practices and uses modern equipment to ensure every stretch of GT Road N-5 remains reliable and well-maintained year-round.